— Case Study
Waste-to-EnergyAssessing the technical and commercial viability of a proposed anaerobic digestion facility to support a regional funding application.
01
A project developer needed to assess the technical and commercial viability of a proposed anaerobic digestion facility processing mixed organic waste, to support a funding application to a regional development body.
The client required an independent, investment-grade assessment covering process design, technology selection, and financial viability to determine whether the project should proceed to detailed engineering.
02
We conducted a comprehensive feasibility assessment including conceptual process design, comparative technology evaluation across two digester configurations, and detailed cost modelling with sensitivity analysis across three feedstock scenarios.
03
Conceptual process design including process flow diagrams, mass and energy balance, equipment sizing and specification, and technology comparison between two digester configurations. CAPEX and OPEX estimates with sensitivity analysis across three feedstock scenarios.
Impact
The feasibility study supported a successful funding application. The project progressed to detailed design.
Start a conversation
Whether you need a feasibility study, independent technical review, or ongoing project support, we're happy to discuss what's involved.